When Mike Cecchini joined RAM, the Vancouver Airport Fuel Delivery Project (VAFD) was still in its early stages. The project would eventually become one of RAM’s defining pieces of pipeline experience, but at the time, Mike was coming in as a Field Engineer, and RAM was still building the team and experience needed to deliver a project of that scale. 

Today, Mike leads RAM’s Major Projects team, and the perspective looks very different. When Mike first joined RAM, VAFD was still in the permitting and pre-engineering stages, and RAM was only beginning to establish the organizational capacity and technical teams required to carry out a project of this size. Delivery became a major step in expanding the company’s pipeline and major-project capabilities. 

VAFD gave RAM experience across the life cycle of a major pipeline project and, most importantly, the opportunity to prove this capability in the field. From there, Mike says the growth was cumulative: deliver good work, bring in specialized people, learn from one another, and carry that experience into the next assignment. 

“It really kicked off from the VAFD activities and performing early on that showed the client we could add value and handle the project,” Mike says. “Then it was about building the teams required for the projects, getting the specialized personnel we needed and learning from each other through execution.” 

That foundation has continued to grow through RAM’s subsequent pipeline work, including assignments with Trans Mountain and FortisBC. Along the way, RAM has expanded its pipeline engineering capacity, inspection experience, lands capabilities, and major project delivery experience. 

Looking back on the projects that helped build that experience, Mike points to VAFD as one of the places where the realities of pipeline construction became especially clear. 

“During VAFD, construction along Bridgeport Road in Richmond called for open-cut installation through utility-dense intersections. Once excavation began, however, the concentration of existing utilities challenged the planned construction method.” says Mike. 

There were two paths forward. The team could continue with open-cut construction, retaining greater control over the installation but requiring highly skilled crews to navigate tight pipeline bends while supporting live third-party utilities. Or, the pipeline could be redesigned for trenchless installation using horizontal directional drilling (HDD), placing it at significant depth beneath the existing utilities. 

“The trenchless approach was selected, reducing the risk of damage to third-party infrastructure and avoiding extended intersection lane closures.” 

For Mike, it’s an example of a broader reality of pipeline construction: you can investigate and plan extensively, but you won’t know everything until you’re in the ground. “You try your best to understand the crossings and what your pipeline is going to have to cross over or under,” he says. “But there’s only so much data out there and only so much investigative work you can do.” 

On VAFD, that sometimes meant opening a road and finding infrastructure that no existing records had prepared the team for. “We were working in roads that were around 100 years old,” Mike says. “You don’t know what you’re going to find. We were finding wooden water mains.” That uncertainty is one reason Mike sees pipeline construction differently from infrastructure concentrated on a single site. 

Pipeline projects can stretch for kilometres, passing through changing ground conditions, roadways, utilities, private properties and different communities. A delay in one location doesn’t necessarily stay there. 

“One small delay can have a domino effect,” he says. “There are just a ton of moving parts in pipelining. It’s very, very dynamic.” 

Mike has experienced the pipeline life cycle in both design and delivery. 

Before joining RAM, he worked on the design of pipelines including Enbridge’s Line 3. Later, his contributions to RAM’s team put him much closer to construction project delivery and managing projects from an oversight perspective. 

“Pipeline design can become segmented,” he explains. “One person may be focused on alignment, another on crossings, and another on specific design parameters. Each piece can be technically sound while the larger construction picture is harder to see.” 

His advice to designers is to keep looking beyond their individual piece. “Try to think about the bigger picture while you’re designing and speak to the rest of the designers about how everything is going to fit together,” Mike says. “It would be beneficial for the project as a whole.” 

It’s a perspective RAM has increasingly been able to build into its own teams: engineering informed by construction, construction informed by design, and specialists who understand how decisions in one part of a linear project can affect everything downstream. 

The experience RAM has been building also comes at a significant time for Canada’s energy infrastructure. In 2025, Canada had 205 planned major energy projects representing approximately $378 billion in potential investment, with another 113 projects worth $132 billion already under construction. Fuel, energy and pipeline infrastructure also represented 31% of Canada’s infrastructure net stock that year. 

Canada’s energy mix is changing, but pipelines remain part of that future. The Canada Energy Regulator’s Canada’s Energy Future 2026 examines several possible pathways rather than predicting a single outcome. Across all scenarios, Canadian natural gas production in 2050 remains above 2024 levels, ranging from approximately 21 to 32 billion cubic feet per day. Much of the potential growth is tied to LNG exports, with production concentrated in Northeast British Columbia and Northwest Alberta. 

Mike says this creates an immense opportunity for RAM to keep building on what it already knows, while expanding its ability to support projects across Canada. He sees the next stage of RAM’s growth as both technical and geographic: continuing to build specialized pipeline resources, developing teams that can work across the country, and strengthening complementary capabilities in areas such as ports and marine infrastructure. 

But his view of how to get there is remarkably similar to how RAM built its pipeline experience in the first place. 

“Keep building on our current projects and continue to provide value for the clients and ensure they’re successful projects,” Mike says. “Then we can use those experiences to win the next one.” 

Over time, each project has added something different to RAM’s pipeline capability: engineering depth, field experience, inspection expertise, lands knowledge, construction management, and a stronger understanding of how all of those pieces fit together. 

Today, Mike sees all of that accumulated experience as the foundation for what comes next, which is larger, more complex pipeline and energy infrastructure projects for RAM across Canada.