Project Summary
Client
The Resort Municipality of Whistler
Budget
1,000,000
Services
Electrical Engineering, Construction Management, Project Management
Market
Utility, Energy
Project Description
The Resort Municipality of Whistler (RMOW) Composting Facility Heat Recovery System was inoperable due to corrosion of the heat pump evaporator coils from suspected high ammonia levels.
RAM’s Role
RAM’s role consisted of:
• Replacing and upgrading the heat recovery system
• Maximizing the heat recovery amount
• Delivering the heat to the compost process building and a new floor aeration system in the materials storage building
• An aeration floor system in the materials storage building
• Preparing tender documents and supporting ROMW in the evaluation process, contract administration and construction management services
• Providing recommendations and design for replacement and expansion of the heat recovery system, the heat delivery systems for the compost process building and floor aeration system