Project Summary
Client
Clearway Group
Budget
$20 Million
Services
Quality Management
Market
Transportation
Project Description
Completed in 2020, this project consisted of installing approximately 820 metres of 630-mm PVC main sanitary sewer line with associated fitting for Metro Vancouver, including three plastic-lined manholes and 20 metres of 267-mm PVC Sanitary line and fittings for the City of Burnaby. Some of the processes involved with this included:
- Open cut excavation;
- One cast-in-place concrete manhole;
- Backfilling as per MMCD;
- Full pavement structure restoration.
Our Role
RAM’s quality management team provided various services for this project, which included:
- Preparing a project specific Quality Control Plan, an Inspection and Test Plan (ITP), and checklists for each work function;
- Performing thorough site inspections;
- Reviewing QC test results, and providing QC summary reports for each segment of work as per Metro Vancouver’s requirements.