Project Summary
Client
Translink
Services
Inspections, Quality Management
Market
Infrastructure, Utility
Project Description
The BC Parkway Stewardson Way Safety Improvement Project includes construction of approx. 800m of asphalt path, a lock block and shotcrete retaining wall, stormwater drainage infrastructure, and intersection improvements. The project is an improvement of the multi-use pathway beneath the Skytrain guideway between River Drive and 14th Street in the City of New Westminster, BC. RAM’s inspector worked on behalf of Allnorth, TransLink’s Engineer of Record, to provide Field Review and Inspection services and Quality Assurance along the BC Parkway Stewardson Way.
RAM’s Role
RAM has been retained to provide Field Review and Inspection Services, including but not limited to:
- Fulfilled the role of EOR’s site representative, ensuring adherence to the design, owner’s specifications, including MMCD standards and municipal supplemental standards.
- Maintained daily inspection reports and journals, including construction photos, on standard documents.
- Pre-construction walkthrough to capture existing conditions.
- Initial and periodic review of Erosion and Sediment control measures.
- Inspection of site grading, retaining walls, stormwater infrastructure, asphalt placement, and streetlighting infrastructure.
- Attending contractor safety meetings and coordinating subconsultants (including electrical, landscaping, & structural).
- RAM’s inspectors supported the EOR with contract administration, including quantity tracking for progress claims, contemplated changes, RFIs, etc.
- Assisted with stakeholder coordination including Metro Vancouver, City of New Westminster, and subconsultants.
- Performed inspection for Substantial Completion, including deficiency checklist(s).