Project Summary
Client
BC Hydro
Budget
$1 Million
Services
Electrical Engineering
Market
Utility
Project Description
A 16-kilometre feeder circuit of 25kVA from the Cambie Substation in Richmond reached its planning limit, resulting in downstream customers experiencing voltage issues. A massive redesign was required for this issue, the main purpose being to reconfigure the feeders, as well as complete some cascade load transfers amongst the feeder circuits to free up the needed capacity beyond the planning limit.
Our Role
In 2020, RAM completed detailed design and engineering technical support during construction, cut-covers, and close out. The project consisted of overhead and underground work. Our scope included:
- Inventory surveying of the feeder and existing equipment;
- Reconducting;
- Replacing fused cut-outs and installation of load break switches;
- Transferring loads;
- Responding to inquiries during construction.