Project Summary
Client
FortisBC
Budget
$150,000
Services
Electrical Engineering
Market
Energy
Project Description
FortisBC operates and maintains nine hydroelectric power facilities within B.C.’s interior, including the Kootenay River, the Columbia River, and the Pend d’Oreille Rive–which stretches from Washington State–with a total generation capacity of 1,547MW.
Our Role
In 2022, RAM’s electrical engineering team supported FortisBC’s Generation Engineering Group on its development of power, control, and instrumentation projects. Our responsibilities included:
- Definition of the scope of work, and battery limits of capital and sustainment projects.
- Conducting thorough estimates according to the AACE Cost Estimate Classification System.
- Coordinating with external consultants for elaboration on the Issued for Construction package.
- Expansion and review of request for proposal documents.
- Coordination of the elaboration of class estimate with external consultants.