Project Summary
Client
Mueller Enterprises / Hecla Mining
Services
Electrical Quality Assurance, Project Coordination
Market
Mining
Project Description
RAM is providing electrical quality assurance and project coordination support for the Silver Trail Highway Water Treatment Plant (STH WTP) project in the Keno Hill Silver District, Yukon. The project consists of three primary work areas: the Upper Bench Water Treatment Plant, Lower Bench pond infrastructure, and associated pipeline systems.
The electrical scope includes power distribution, MCC and PLC integration, instrumentation and controls, heat tracing, field equipment, substation infrastructure, backup power systems, and commissioning support.
Our Role
RAM’s team is providing support for this project in multiple ways. Our responsibilities include:
- Providing quality assurance oversight for the electrical scope;
- Verifying electrical installation activities;
- Supporting the implementation of Inspection and Test Plans (ITPs);
- Tracking inspection records and managing turnover documentation;
- Coordinating between construction, engineering, vendors, and owner representatives;
- Supporting all commissioning readiness through project handover.