Project Summary
Client
Synagro
Services
Compliance Services
Market
Waste Management
Project Description
The City and County of Honolulu (CCH) contracted with Synagro to design, build, and operate an in-vessel bioconversion facility located at the Sand Island Wastewater Treatment Plant.
The facility consists of an egg-shaped anaerobic digester, centrifuge dewatering, and a heat-drying bioconversion facility, which processes the biosolids produced in CCH’s main wastewater treatment plant into Granulite pellets. The pellets produced provide a natural substitute for synthetic fertilizer to Oahu’s agricultural and landscaping communities. This produces an Exceptional Quality-designated product, and provides a model for a closed-loop environmental system.
Our Role
RAM provided consulting services in compliance with industry standards, legal requirements, and project-specific guidelines. Our scope of work included essential activities to complete the project while ensuring regulatory compliance and professional integrity, such as:
- reviewing drawings and technical data – analyzing the provided documentation to ensure compliance with project specifications and standards;
- assessing contractor claims – evaluating the validity of claims based on the reviewed documentation, including justifications for changes, delays, or additional costs;
- conducting comparisons – comparing and contrasting the contractor’s submissions with original contracts and project plans to identify discrepancies or unsupported claims;
- preparing reports – documenting findings and providing recommendations based on the analysis for decision-making by project stakeholders;
- ensuring compliance – verifying that all claims aligned with contractual obligations and relevant regulations.