Project Summary

Client
BC Hydro

Budget
$60,000

Services
Electrical Engineering

Market
Utility

Project Description

The underground transformers at two locations in Downtown Vancouver required replacement as part of BC Hydro’s Maintenance project. The scope of work consisted of the replacement of existing BC Hydro vaults V0016 and V0064 with new 1617 standard vaults at both locations and new Siemens submersible 167kVA transformers.

There were many risks associated with replacing V0016 and V0064, including lengthy outages.

RAM’s Role

To mitigate these outages, RAM prepared underground civil and electrical designs for vault replacements that minimized outages that could affect consumers. RAM prepared the replacement designs for both V0016 and V0064 vaults. The scope of work also included the following:

  • Corresponding with City of Vancouver to ensure construction permits are approved for all designs.
  • Attending construction site visits and meetings involving hold/witness points on civil designs to ensure proper installation of vaults and trench cut prior to backfill.
  • Preparation of project cost estimates and material requests required for designs.
  • Creating designs which avoided lengthy outages and need for diesel generators to save on construction costs.
  • Underground asset inspections of devices that were affected by vault replacement.