Project Summary
Client
FortisBC
Budget
$1 Million
Services
Project Management, Engineering
Market
Energy
Project Description
Stress corrosion cracking (SCC)and other crack-like imperfections have been identified on the CTS(Coastal Transmission System) project through integrity digs, which could be a potential hazard for the pipeline system and can result in the failure of the pipeline. Identified pipeline hazards are required to mitigated as per CSA Z662-19 and BC Oil and Gas Activities Act.
FortisBC’s natural gas transmission pipeline integrity work, known as the Transmission Integrity Management Capability Project (TIMC), has a total of 21 pipeline locations and 13 facility sites that are included in the scope of this project.
RAM’s Role
RAM provided technical and project management support for engineering management and engineering design. Reviews to the project specifically included the following:
- Class 3 cost estimate which includes basis of estimate, basis of schedule and cash flow
- Master crossing lists
- FEED Report
- Design Basis Memorandum (DBM) for Pipeline and Facility
- Construction Execution Plan
- Variance Notices
- Deliverables List