Project Summary
Client
FTG Constructors
Budget
$700 Million
Services
Construction Management
Market
Energy, Utility
Project Description
In order to facilitate the construction of the Highway 99 and Highway 17 interchange, the existing BC Hydro 69kV transmission lines needed to be relocated. The scope of the project included the installation of 30m transmission structures and required a highway closure for installing and removing the overhead lines.
RAM’s Role
RAM was retained by the joint venture FTG Constructors, comprising of Ledcor, Dragados, BellPacific and Vancouver Pile Driving. This $700 Million P-3 project was a design, build, operate, finance and maintain. RAM provided project management services for construction and technical design review for all third party utilities. RAM staff was integrated into the joint venture team and directly managed approximately $230 Million of construction scope.